Industry news|2022-02-28| admin
The main components of the plum blossom elastic coupling are the shaft sleeves at both ends and the elastic body in the middle. The elastic coupling can transmit torque with zero backlash and no vibration. Backlash can be eliminated with elastomers. Some problems will also be encountered in the application of elastic couplings. Today, I will introduce to you how to install elastic couplings during use and what to pay attention to.
1. Before installation, first check whether the two shafts of the prime mover and the working machine are concentric, whether there is wrapping paper and collision on the surfaces of the two shafts, whether there are debris in the inner holes of the two half couplings of the plum coupling, and whether there is collision at the edge of the inner hole . If so, clean the shaft and coupling halves and use a fine file to handle the bumps. Then check whether the diameter and length of the inner hole of the two half couplings are consistent with the diameter and length of the shaft extension of the prime mover and the working machine. In general selection, it is better to let the length of the half coupling at the end of the prime mover and the working machine be less than the length of its shaft extension by 10-30mm.
2. In order to facilitate installation, it is best to put the two half couplings into a 120-150 incubator or oil tank for preheating, so that the size of the inner hole is increased and it is easy to install. After installation, make sure that the shaft head cannot protrude from the end face of the half coupling, preferably flush. Detect the distance between the two half couplings: measure the readings of 3-4 points along both sides of the half coupling flange, as well as the sum of the measured dimensions of the extension section and the two membrane groups, and the error is controlled in the range of 0-0.4mm Inside.
3. Correction: use a dial indicator to detect the runout of the flange end face and outer circle of the two halves of the coupling. When the outer circle of the flange is less than 250mm, the runout value shall not be greater than 0.05mm; when the outer circle of the flange is greater than 250mm, the runout value shall not be greater than 0.08.
4. Install bolts: Insert the bolts from the outside of the small hole of the flange, and pass through the outside of the large hole of the other flange. Put on the buffer sleeve, elastic washer, twist the nut, and tighten the nut with a wrench. If the installation is uncomfortable or disassembled for replacement, the shaft and half-coupling will not be damaged, and it is best to rotate freely after installation.
5. Operation instructions: Before starting the equipment, check whether the nut of the plum coupling is loose or falls off. If so, tighten the nut with a wrench in time.
The installation process of the plum blossom coupling does not require too many preparations. The main thing is to do the preparatory work before installation, grasp the details of the installation well, and do the debugging work well. More is still a matter of details, so try not to install it before the preparations are done. For more questions, you can consult Shenzhen Weidong.
| 17c成人永久免费视频 | 小宝精选一区二区三区 | 久久婷婷婬片A片AAA | 国产裸体美女永久免费无遮挡 | 欧美精品极品www | 日韩激情视频在线观看 | 日韩精品一区二区日批涩涩 | caopengshipin| 国产做爰XXXⅩ久久久 | 国产精品乱码色情一区二区三区最新版 | 成人H動漫精品一區二區無碼 | 在线 日韩 亚洲 | 男子多次冒充员工参加年会被行拘 | 国产乱码精品久久久 | 亚洲vs无码秘 蜜桃少妇 | 国产美女裸体无遮挡免费视频试看 | 国产精品扒开腿做爽爽爽视频 | 国产成人精品人妻熟女a 6 2v久久 | 天堂VA蜜桃一区二区三区 | 国产午夜内射骚妇资源在线 | 精品久久一区二区在线观看 | 码18 免费视频 | 亚洲日韩高清无码 | 在线自偷国偷产品一区 | 亚洲一区二区三区av在线观看 | 黄色视频免费看网站 | 麻豆精品秘 国产传媒mv在线观看 | 久久久久久久久久性爱潮久久久久久久久久 | 国产精品视频在线免费观看 | 影音先锋豆豆色AV资源网 | 91在线看视频免费 | 特级婬片A片AAA毛多妇科医生 | 国产一区二区视频在线播放 | 91亚洲人午夜一线二香蕉吧在线 | 婷婷五月丁香六月一区二区三区 | 少女哔哩哔哩高清在线播放视频 | 亚洲色噜噜噜网站在线观看 | 亚洲AV无码乱码精品国产竹菊 | 麻豆乱码国产一区二区三区 | 少妇人妻太紧了A毛片无码 特级大胆西西4444人体 |